Language:CHINESESENGLISH

Home > News >
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.com
Features heavy-duty steel corrosion protection methods analysis
Features heavy-duty steel corrosion protection methods analysis      Large steel structure such as a bridge, tower, high voltage junction tower, lightning tower, sea lighthouse, a large reservoir gates, water towers, offshore oil...
2014/12/31
About Building Construction Safety Supervision Measures
About Building Construction Safety Supervision Measures Promote the progress of science skills to enhance the skills of building construction, continuous improvement in the quality of the project also found a lot of new questions. Work place safety ...
2014/12/31
Foshan Steel: Central Bay Avenue Adds a steel footbridge
Foshan Steel: Central Bay Avenue Adds a steel footbridge      "In the future exchanges on Bay Avenue on both sides of the ring much more convenient, but also much safer." Yesterday morning, the yellow canopy uncle after the villa...
2014/12/27
The North's largest steel base in Tianjin
The North's largest steel base in Tianjin          Recently, the North's largest steel production base - CCT Steel Co., Ltd. Tianjin Steel production plant groundbreaking in Xiqing District, the high-end metal...
2014/12/27
"Hegemony" of containers moving room to move Three years ago, container moving into the house with its convenient low Taizhou market, to facilitate the migrant workers are living, by the engineering construction units welcome. But some container doe...
2014/12/24
Foshan Steel: Steel construction of the
Foshan Steel: Steel construction of the "Belle Epoque" Ren Zhiqiang, chairman of Huayuan Real Estate on (micro-Bobo-off) of the "departure", the media will be positioned in 2014, "veteran developers" farewell the first year, which means that real es...
2014/12/24
Foshan Steel: Jiangsu Grand Theatre main measure to begin construction in 2016 put into use
Foshan Steel: Jiangsu Grand Theatre main measure to begin construction in 2016 put into use Yesterday, Jiangsu, located west of the Grand Theatre construction before entering the main construction phase. Project as a whole was "teardrop-shaped" in t...
2014/12/24
Foshan Steel: retrofitting old elevator is still very difficult
Foshan Steel: retrofitting old elevator is still very difficult EDITORIAL Chahar Road 16 nuclear engineering guihuayuan 9 yesterday finally completed the installation of the elevator construction, the residents of this building is very happy. To th...
2014/12/20
Foshan Steel: Steel construction in western China officially started construction of a manufacturing base
Foshan Steel: Steel construction in western China officially started construction of a manufacturing base         December 11, Western China construction steel manufacturing base project officially started construc...
2014/12/20
In response to the construction of ecological civilization construction steel into strategic repositories
In response to the construction of ecological civilization construction steel into strategic repositories Foshan Steel data show that in 2013 China's crude steel production was 779 million tons, accounting for 48.5 percent of global production, stee...
2014/12/17
Steel construction management and technical connubial lift savings storm
Steel construction management and technical connubial lift savings storm Follow green building a national strategy, "Green Building Evaluation Standard" since January 1, 2015 will be formally implemented. In the near future, China will be mandatory ...
2014/12/17
Beijing's first high-rise steel buildings in May next year, stay home
Beijing's first high-rise steel buildings in May next year, stay home It only took 75 days, 20-storey building of public rental Mentougou lead wire plant a "skeleton" where they stand. It is the "skeleton" is no longer likely to cause spilling conc...
2014/12/17
page:36  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号