Position:Home > Product > Details

Ghana Workshop

Product Description


Steel Structure Workshop in Ghana
Garner workshop is located in African countries. This workshop is designed with a 10 ton crane, which is mainly used for production lifting. The installation of the workshop needs to install the steel column first, then the crane, and finally the roof, so as not to affect the installation of the crane. This workshop is installed under the guidance of engineers sent by Shengbang Steel Structure Co., Ltd. the installation time of this workshop is only one month. Here are some installation pictures of the building:
Design Drawings for Workshops in Ghana


Ghana Workshop Installation Site

Ghana Workshop Project Completes Steel Frame Installation



Back To Top

Foshan Shengbang Steel Structure Co., Ltd.

All rights Reserved:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd.