Position:Home > News > Text

Foshan Steel: Jiangsu Grand Theatre main measure to begin construction in 2016 put into use

Time:[2014-12-24]  View:5617

Foshan Steel: Jiangsu Grand Theatre main measure to begin construction in 2016 put into use

Yesterday, Jiangsu, located west of the Grand Theatre construction before entering the main construction phase. Project as a whole was "teardrop-shaped" in the steel used in the construction of the multilateral profiled steel, estimated in 2016 the project will be put into use.

Back To Top

Foshan Shengbang Steel Structure Co., Ltd.

All rights Reserved:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd.