Position:Home > News > Text

Control purposes tall buildings?

Time:[2014-7-26]  View:4915

Control of high-rise building construction intentions?
Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum displacement and displacement to be controlled, the main intent of the following:
1, to ensure that the basic structure of the body in elastic stress state, to prevent cracks in the concrete wall studs, floor slab crack control number, width.
2, ensure the integrity of infill walls, walls, walls and other non-structural components, to prevent significant damage.
3, the regularity of the control plane configured to avoid the formation changes, adverse effects on the structure.
Back To Top

Foshan Shengbang Steel Structure Co., Ltd.

All rights Reserved:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd.