Language:CHINESESENGLISH

Home > News > Song Normal fronted steel or completion flyover next year January 20
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.com

Song Normal fronted steel or completion flyover next year January 20

Time:[2014-10-18]  Hits:4913

Recently, the sunshine in front of Qufu Normal University, North Campus is building 50 meters long pedestrian bridge. It is reported that the project since the beginning Oct. 1, to January 20, 2015 ended during the road closure will be conducted in accordance with the project schedule.

This project is one of Rizhao City 2014 key urban construction projects. Overpass for steel, herringbone, from north to south across the road in the middle of Binzhou, a total length of 50 meters, 1.4 meters high beams, bridges minimum clearance height 6.365 meters, the main bridge 5.4 meters wide (full width) stairway width: 4.0 m (full width). Qufu Normal University student, said the building at the north entrance overpass, to facilitate their passage conducive security. Especially on the student, class time, people flow, then repair the bridge, the vehicle can facilitate normal driving.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号